Don't be fooled. Train at it all you like - a great S&OP/IBP alone won't win you the fight.
I was recently with a client, picking through their monthly cycle. Reviews ran on time, departments turned up, demand talked to supply, finance was in the room. Not bad at all.
But something nagged. They had IBP. The control, the execution, the benefits - none of it quite landing. Turns out the gap wasn't inside IBP. It was the weekly rebalancing cycle - ITP, Integrated Tactical Planning if you want the full name - that catches what's shifted since sign-off, and carries a line back up.
Doesn't matter how good your monthly IBP is. Every improvement on that table breaks on the way down without one.
The fault isn't inside it
Easy trap. Assess IBP on its own - especially if your title has the letters 'IBP' in it - and of course it passes. Marked against its own maturity model. There are checklists for that.
Flying a plane in a straight line is the easy part. It's the landing that sorts you out.
IBP is one layer in a bigger planning structure. It's only worth what the layers around it do with what it hands them.
Judge it alone and you'll find fault with something that isn't broken - the fault isn't in there. Worse, every fix compounds the problem. You tune parts that were fine while the plan walks out of the room and vanishes.
Four cycles, not one
If your whole planning world is the monthly IBP meeting, fair enough - it's the one with your name on the invite. But it's one of four cycles running at once: strategy in years, IBP in months, ITP - or S&OE - in weeks, execution in days and hours.
All four plan. All four execute. Speed and horizon change. The job doesn't. Which is why "fix our IBP and that solves it" makes me twitchy - as if one lot thinks and the other lot just happens.
What good is a plan nobody's executing? Or execution nobody's checking against the plan?
Inside the weekly ITP meeting
I've sat in plenty of these. Genuinely busy - KPIs up, service failures aired, someone's got a better run sequence. Good people, doing real work.
What's often missing is one question: does this still meet the plan we signed off? If not - why not? So what? Now what? And who do we tell?
That last one is where it dies. The room can work out the rest and still let it die - nobody ever told them carrying it upstairs was the job.
What that costs you, upstairs
So the plan quietly stops being true, and nobody tells you.
Three weeks later your exec team steers the company off a map that expired on a Wednesday nobody mentioned. Reviews on time. Numbers reconciled. Everyone confident.
That's what should worry you. Not that your IBP is weak. It's probably fine. It's strong, it isn't landing, and nothing is coming back to tell you.
Because IBP is how you control your company. And you can't control what you never hear back from.
What I told the client
Fix the IBP - sharper assumptions, closer market signals, all of it. Worth doing. Start tomorrow.
But build the weekly process that executes it too, and the line that carries back what it finds. That's a piece of work in its own right - and it's coming.
Short version: IBP? Great. But only with its friends.
An IBP on its own is fit, well-drilled, well-attended - and fighting nobody. All that training. Never gets in the ring.
So - when did something from your weekly cycle last change what your IBP decided?
I don't write these to chase work. I write them because too many planning processes run on autopilot and nobody says anything. If this sparked a thought, that's enough. If you want to talk about it, find me at planninglab.co.nz/blogs.
#IBP #S&OP